CAPITAL PROJECTS/CONSTRUCTION

Request email notification when page changes E-Notify
WATER    SEWER

Walnut Grove Tank Rehab

At a Glance: MCES is in the process of rehabilitating the tank along Sheehan Road.
Location: Centerville
Start Date: July 2022
End Date: November 2022
Status: Under construction

         

 SMART Project 

At a Glance: MCES will build a new influent pump station at its Dryden Road location. Those pumps will transport millions of gallons a day to the Western Regional Wastewater Treatment Facility in West Carrollton.

Also to be constructed is a pretreatment facility at Western Regional, which will provide screening and grit removal to remove debris and grit. The screens will remove particles 4 mm and larger.

Location: Moraine, West Carrollton

Start Date: May 2022
End Date: 2024
Status: Pre-Construction

Learn more about the SMART Project.

Lynnhaven and Meyer Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water mains on Meyer Ave.; Ellington Road from Conway Road to Crestview Road; Crestview Road; Conway Road from Ellington Road to Meyer Avenue; Lynnhaven Drive from Meyer Avenue to Eden Lane; Atwood Place; Longview Avenue; Fenwick Court; Wicker Place; Bonnieview Avenue; Hazelton Avenue; Valentine Drive and Eden Lane. 
Location: Riverside
Start Date: July 2021
End Date: September 2022
Status: Currently in the construction phase

 

Belt Filter Replacement

At a Glance: Montgomery County Environmental Services is designing a replacement for the current Belt Filter Dewatering Device at the Eastern Regional Water Treatment Plant
Location: Kettering
Start Date: November 2022
End Date: June 2024
Status: Post Construction/Closeout

Spinning and Eastman Water Main Replacement II

At a Glance: Montgomery County Environmental Services is replacing the water mains on Biltmore Place, Mundy Court and Robinwood Avenue.
Location: Riverside
Start Date: July 2022
End Date: August 2023
Status: Currently in the construction phase

 

Concrete Rehab Eastern Regional Phases 1-3

At a Glance: Montgomery County Environmental Services is repairing concrete structures at the Eastern Regional Water Reclamation Facility in multiple phases. Phases 1 & 2 dealt with safety concerns found in an assessment. Phase 3 (final phase) will repair the concrete in 24 tank structures at the facility.
Location: Kettering
Start Date: October 2022
End Date: July 2023
Status: Phases 1&2 complete. Phase 3 is currently in the bidding phase.

Spinning and Eastman Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water mains on Spinning Rd. from Burkhardt Rd. to 900’ southward and on Eastman Ave.
Location: Riverside
Start Date: January 2020
End Date: August 2021
Status: Post Construction/Closeout


 

Woodman Dorothy Siphon 

At a Glance: Montgomery County Environmental Services is currently in the beginning stages of design of a new lift station to replace the existing sanitary sewer siphon that serves the Woodman Plaza and the Kettering Towne Center.
Location: Kettering
Start Date: Construction start TBD
End Date: TBD
Status: Currently in the design phase


 

Bayside and Barrett Main Replacement

At a Glance: Montgomery County Environmental Services is repairing water mains along Bayside Drive, Gramercy Drive, Orinoco Street, Denny Lane, Pandora Drive and Chaucer Road.
Location: Riverside
Start Date: August 2022
End Date: August 2023 
Status: Currently in the pre-construction phase 

 

Austin Boulevard Sanitary Sewer Replacement

At a Glance: Montgomery County Environmental Services is replacing an existing 21-inch reinforced concrete sewer, along Austin Boulevard, immediately north of the Dayton-Wright Brothers Airport. This project is being undertaken in response to a failure of the existing sanitary sewer.
Location: Miami Township, Ohio
Start Date: July 2022 
End Date: May 2023 
Status: Currently in the construction phase

Dorothy Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing water mains on Dorothy Lane between Far Hills Avenue and Shroyer Road.
Location: Kettering
Start Date: August 2022
End Date: August 2023
Status: Currently in the pre-construction phase

 

Terrace Villa Sanitary Sewer Improvements

At a Glance: Montgomery County Environmental Services is lining, replacing, and upsizing sewers in the Terrace Villa area. A relief sewer will also be installed. These measures are being taken to reduce sanitary sewer overflows from manholes and reduce basement flooding.
Location: Centerville and Washington Township
Start Date: March 2021
End Date: May 2022
Status: Currently in the post-construction phase

 

 

Erosion Control - Site 14 Newmark Drive

At a Glance: Montgomery County Environmental Services is reconstructing 100’ of 12” Sanitary Sewer and associated manholes that were damaged by a storm sewer outfall and nearby creek.
Location: Miami Township
Start Date: May 2022
End Date: August 2022
Status: Under construction. 

 

   

Habitat and Summit Med Lift Station Replacement

At a Glance: Montgomery County Environmental Services owns and operates two sanitary lift stations servicing the Habitat Condominium Owners Association properties located west of Springboro Pike (SR 741) and an adjacent commercial park area located on Summit Glen Drive. Both lift stations are nearing the end of their useful lives and will be replaced by one lift station for both services.
Location: Miami Township
Start Date: May 2022
End Date: December 2023
Status: Currently in the construction phase

 

 

Belt Filter Replacement 

At a Glance: Montgomery County Environmental Services is designing a replacement for the current Belt Filter Dewatering Device at the Eastern Regional Water Treatment Plant.
Location: Kettering
Start Date: March 2019
End Date: TBD
Status: Bidding/Pre-Construction