CAPITAL PROJECTS/CONSTRUCTION

Request email notification when page changes E-Notify

Centerville Tank Rehab – North Tank

At a Glance: MCES is in the process of rehabilitating the Northern Tank near the Tower Heights Middle School. The Southern tank was completed in 2020.
Location: Centerville
Start Date: May 2021
End Date: October 2021
Status: Under construction

         

 Belt Filter Replacement

At a Glance: Montgomery County Environmental Services is designing a replacement for the current Belt Filter Dewatering Device at the Eastern Regional Water Treatment Plant.
Location: Kettering
Start Date: March 2019
End Date: TBD
Status: Bidding/Pre-Construction 

Sheldon 12” Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the 12” and 6” water mains on Sheldon Drive with a new 12” main. Centerville is also upgrading storm sewer infrastructure and adding curb to Sheldon Dr.
Location: Centerville
Start Date: June 2021
End Date: November 2021
Status: Water Main work is complete, Storm Water Improvements pending gas main work

 

Guenther & Schroeder Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water mains on Guenther Rd. from Little Richmond Rd. to the Dayton City Limits and Schroeder Rd.
Location: Trotwood
Start Date: June 2019
End Date: September 2021
Status: Post Construction/Closeout

Cynthia Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the 6” water mains on Cynthia Ln. and Bur Del Dr. from Cynthia Ln. to Towerview Rd. with new 8” main.
Location: Washington Township
Start Date: April 2021
End Date: May 2021
Status: Complete


 

Lynnhaven and Meyer Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water mains on Meyer Ave.; Ellington Rd. from Conway Rd. to Crestview Rd.; Crestview Rd.; Conway Rd. from Ellington Rd. to Meyer Ave.; Lynnhaven Dr. from Meyer Ave. to Eden Ln.; Atwood Pl.; Longview Ave.; Fenwick Ct.; Wicker Pl.; Bonnieview Ave.; Hazelton Ave.; Valentine Dr.; and Eden Ln.
Location: Riverside
Start Date: January 2020
End Date: May 2022
Status: Currently in the construction phase

Spinning and Eastman Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water mains on Spinning Rd. from Burkhardt Rd. to 900’ southward and on Eastman Ave.
Location: Riverside
Start Date: January 2020
End Date: August 2021
Status: Post Construction/Closeout


 

Bricker Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the 6” water mains along Bricker Ave. with new 8” main.
Location: Jefferson Township
Start Date: June 2021
End Date: October 2021
Status: Post Construction/Closeout


 

Concrete Rehab Eastern Regional – Phases 1-3

At a Glance: Montgomery County Environmental Services is repairing concrete structures at the Eastern Regional Water Reclamation Facility in multiple phases. A previous assessment identified deterioration, cracking, and spalling of the concrete structures throughout the facility. Phases 1 & 2 dealt with safety concerns found in the assessment. Phase 3 (the final phase) will repair the concrete in 24 tank structures at the facility.
Location: Kettering
Start Date: June 2021 (Phase 3)
End Date: May 2022 (Phase 3)
Status: Phases 1 -3, Status – Phase 1 & 2 Complete, Phase 3 Under Construction 

 

Woodman Dorothy Siphon

At a Glance: Montgomery County Environmental Services is currently in the beginning stages of the design of a new lift station to replace the existing sanitary sewer siphon the serves Woodlane Plaza and the Kettering Towne Center. 
Location: Kettering
Start Date: Construction start June 2022
End Date: TBD
Status: Currently in the design phase

Brydon Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water main on Brydon Rd. from Far Hills Ave. to Shroyer Rd.
Location: Kettering
Start Date: January 2020
End Date: July 2021
Status: Post Construction/Closeout

 

Erosion Control – Site 7 Folkestone Drive

At a Glance: Montgomery County Environmental Services is fortifying a small creek to protect a water and sewer main that cross the creek within a failing concrete encasement.
Location: Washington Township
Start Date: October 2021
End Date: TBD
Status: Currently Bidding

Erosion Control - Site 11 Fair Park

At a Glance: Montgomery County Environmental Services is fortifying a small creek to protect several water main connections that cross the creek.
Location: Riverside
Start Date: October 2021
End Date: TBD
Status: Currently Bidding

 

Erosion Control - Site 14 Newman Drive

At a Glance: Montgomery County Environmental Services is reconstructing 100’ of 12” Sanitary Sewer and associated manholes that were damaged by a storm sewer outfall and nearby creek.
Location: Miami Township
Start Date: October 2021
End Date: TBD
Status: Project delayed by easement acquisition and tree clearing restrictions. 

Woodland Hills Water Main Replacement Phase 4

At a Glance: Montgomery County Environmental Services is replacing the water mains on Ross Ave. from Woodland Hills Blvd. to Coronette Ave.; Wire Dr. from Woodland Hills Blvd. to Coronette Ave.; Brandon Rd.; Ottello Ave.; Calvin Ave.; and Boulder Ave. from Ross Ave. to Webster St.
Location: Harrison Township
Start Date: February 2019
End Date: May 2021 (Tentatively) 
Status: Post Construction/Closeout

   

Habitat and Summit Med Lift Station Replacement

At a Glance: Montgomery County Environmental Services owns and operates two sanitary lift stations servicing the Habitat Condominium Owners Association properties located west of Springboro Pike (SR 741) and an adjacent commercial park area located on Summit Glen Drive. Both lift stations are nearing the end of their useful lives and will be replaced by one lift station for both services.
Location: Miami Township
Start Date: May 2019
End Date: June 2022
Status: Bidding

Terrace Villa Sanitary Sewer Improvements

At a Glance: Montgomery County Environmental Services is lining, replacing, and upsizing sewers in the Terrace Villa area. A relief sewer will also be installed. These measures are being taken to reduce sanitary sewer overflows from manholes and reduce basement flooding.
Location: Centerville and Washington Township
Start Date: March 2021
End Date: November 2021
Status: Currently in the construction phase, sanitary sewer installation to begin in April/May 2021

 

West Franklin Water Main Replacement

At a Glance: Montgomery County Environmental Services is replacing the water main on West Franklin Ave. from Normandy Ln. to N Main St.
Location: Centerville
Start Date: August 2018
End Date: July 2021
Status: Post Construction/Closeout

Austin Boulevard Sanitary Sewer Replacement

 

At a Glance: Montgomery County Environmental Services is replacing an existing 21-inch reinforced concrete sewer, along Austin Boulevard, immediately north of the Dayton-Wright Brothers Airport. This project is being undertaken in response to a failure of the existing sanitary sewer.
Location: Miami Township, Ohio
Start Date: October 2020 (design) 
End Date: June 2022 (construction) 
Status: 90% detailed design phase