Capital Projects / Construction
Water
Walnut Grove Tank Rehab
- At a Glance: MCES is in the process of rehabilitating the tank along Sheehan Road.
- Location: Centerville
- Start Date: July 2022
- End Date: November 2022
- Status: Under construction
Lynnhaven & Meyer Water Main Replacement
- At a Glance: Montgomery County Environmental Services is replacing the water mains on Meyer Avenue; Ellington Road from Conway Road to Crestview Road; Crestview Road; Conway Road from Ellington Road to Meyer Avenue; Lynnhaven Drive from Meyer Avenue to Eden Lane; Atwood Place; Longview Avenue; Fenwick Court; Wicker Place; Bonnieview Avenue; Hazelton Avenue; Valentine Drive and Eden Lane.
- Location: Riverside
- Start Date: July 2021
- End Date: September 2022
- Status: Currently in the construction phase
Spinning & Eastman Water Main Replacement II
- At a Glance: Montgomery County Environmental Services is replacing the water mains on Biltmore Place, Mundy Court, and Robinwood Avenue.
- Location: Riverside
- Start Date: July 2022
- End Date: August 2023
- Status: Currently in the construction phase
Spinning & Eastman Water Main Replacement
- At a Glance: Montgomery County Environmental Services is replacing the water mains on Spinning Road from Burkhardt Road to 900' southward and on Eastman Avenue
- Location: Riverside
- Start Date: January 2020
- End Date: August 2021
- Status: Post Construction/Closeout
Bayside & Barrett Main Replacement
- At a Glance: Montgomery County Environmental Services is repairing water mains along Bayside Drive, Gramercy Drive, Orinoco Street, Denny Lane, Pandora Drive, and Chaucer Road.
- Location: Riverside
- Start Date: August 2022
- End Date: August 2023
- Status: Currently in the pre-construction phase
Dorothy Water Main Replacement
- At a Glance: Montgomery County Environmental Services is replacing water mains on Dorothy Lane between Far Hills Avenue and Shroyer Road.
- Location: Kettering
- Start Date: August 2022
- End Date: August 2023
- Status: Currently in the pre-construction phase
On June 27, 2023, engineers Renee Miller and Charles Schaffer stand with County Commissioners Judy Dodge, Carolyn Rice, and County Administrator Michael Colbert. They are also joined by Montgomery County Environmental Services Director Matt Hilliard and Adam Athmer from Strand Associates Inc. (L to R: Michael Colbert, Judy Dodge, Carolyn Rice, Renee Miller, Adam Athmer, Matt Hilliard, and Charles Schaffer)
Sewer
SMART Project
- At a Glance: MCES will build a new influent pump station at its Dryden Road location. Those pumps will transport millions of gallons a day to the Western Regional Wastewater Treatment Facility in West Carrollton. Also to be constructed is a pretreatment facility at Western Regional, which will provide screening and grit removal to remove debris and grit. The screens will remove particles 4 mm and larger.
- Location: Moraine, West Carrollton
- Start Date: May 2022
- End Date: 2024
- Status: Pre-Construction
Learn more about the SMART Project
Belt Filter Replacement
- At a Glance: Montgomery County Environmental Services is designing a replacement for the current Belt Filter Dewatering Device at the Eastern Regional Water Treatment Plant
- Location: Kettering
- Start Date: November 2022
- End Date: June 2024
- Status: Post Construction/Closeout
Concrete Rehab Eastern Regional Phases 1-3
- At a Glance: Montgomery County Environmental Services is repairing concrete structures at the Eastern Regional Water Reclamation Facility in multiple phases. Phases 1 and 2 dealt with safety concerns found in an assessment. Phase 3 (final phase) will repair the concrete in 24 tank structures at the facility.
- Location: Kettering
- Start Date: October 2022
- End Date: July 2023
- Status: Phases 1 and 2 are complete. Phase 3 is currently in the bidding phase.
Woodman Dorothy Siphon
- At a Glance: Montgomery County Environmental Services is currently in the beginning stages of design of a new lift station to replace the existing sanitary sewer siphon that serves the Woodman Plaza and the Kettering Towne Center.
- Location: Kettering
- Start Date: Construction start TBD
- End Date: TBD
- Status: Currently in the design phase
Austin Boulevard Sanitary Sewer Replacement
- At a Glance: Montgomery County Environmental Services is replacing an existing 21-inch reinforced concrete sewer, along Austin Boulevard, immediately north of the Dayton-Wright Brothers Airport. This project is being undertaken in response to a failure of the existing sanitary sewer.
- Location: Miami Township, Ohio
- Start Date: July 2022
- End Date: May 2023
- Status: Currently in the construction phase
Terrace Villa Sanitary Sewer Improvements
- At a Glance: Montgomery County Environmental Services is lining, replacing, and upsizing sewers in the Terrace Villa area. A relief sewer will also be installed. These measures are being taken to reduce sanitary sewer overflows from manholes and reduce basement flooding.
- Location: Centerville and Washington Township
- Start Date: March 2021
- End Date: May 2022
- Status: Currently in the post-construction phase
Erosion Control - Site 14 Newmark Drive
- At a Glance: Montgomery County Environmental Services is reconstructing 100' of 12" Sanitary Sewer and associated manholes that were damaged by a storm sewer outfall and nearby creek.
- Location: Miami Township
- Start Date: May 2022
- End Date: August 2022
- Status: Under construction.
Habitat and Summit Med Lift Station Replacement
- At a Glance: Montgomery County Environmental Services owns and operates two sanitary lift stations servicing the Habitat Condominium Owners Association properties located west of Springboro Pike (SR 741) and an adjacent commercial park area located on Summit Glen Drive. Both lift stations are nearing the end of their useful lives and will be replaced by one lift station for both services.
- Location: Miami Township
- Start Date: May 2022
- End Date: December 2023
- Status: Currently in the construction phase
Belt Filter Replacement
- At a Glance: Montgomery County Environmental Services is designing a replacement for the current Belt Filter Dewatering Device at the Eastern Regional Water Treatment Plant.
- Location: Kettering
- Start Date: March 2019
- End Date: TBD
- Status: Bidding/Pre-Construction