Road Closure - Miamisburg-Springboro Road

Paul Gruner, P.E., P.S., Montgomery County Engineer, wishes to announce the closing of Miamisburg-Springboro Road required for the next phase of the road widening project between Peacock Lane and Medlar Road.

The project will require closing Miamisburg-Springboro Road to through traffic between Byers Road and Benner Road beginning on Monday, August 29, 2011, for approximately two weeks. A detour route will be signed via Byers Road and Benner Road. Medlar Road will also be closed at Miamisburg-Springboro Road for a portion of this time for intersection construction. This detour will be signed via Benner Road, Dayton-Cincinnati Pike, and Crains Run Road.

This work is somewhat weather dependent, and updates will be communicated as necessary.

The patience of the public and their careful, safe driving during these operations are greatly appreciated.

Please contact Paul Gruner at 937.225.6040 (office), 937.422.4399 (cell), or via email at grunerp@mcohio.org if you have any questions.

About the Montgomery County Engineer

County Engineers in Ohio are required by law to be registered as both Professional Engineers (P.E.) and Professional Surveyors (P.S.) They are responsible for the maintenance and construction of county roads and maintenance and construction of bridges on county roads, township roads, and certain streets within municipalities. They are also responsible for maintaining land surveying records, checking the accuracy and adequacy of recorded land transfer records, and establishing or re-establishing certain land survey monuments.

News
13th Annual Car Show - Stillwater Center Families & Friends, Inc.
The Stillwater Center Families and Friends, Inc. 13th Annual Car Show will take place on Sunday, July 19, 2015 at Stillwater Center, 8100 N. Main Street, Dayton, from
10 a.m. to 3 p.m.  Read More...
Heathcliff Road Bridge Closure in Butler Township
Paul Gruner, P.E., P.S., Montgomery County Engineer, announced that Heathcliff Road will be closed at the Stillwater River for the total rehabilitation of the bridge over the Stillwater, and a detour will be in place.  Read More...
Keith Takes Oath of Office for 5th Term as Auditor
Auditor Karl Keith takes oath of office for his fifth term.  Read More...
More News...