CAPITAL PROJECTS/CONSTRUCTION

Request email notification when page changes E-Notify

 Solid Waste Operations Center
At a Glance:
Montgomery County Environmental Services is building a new Operations Center on the campus of its Solid Waste Transfer Station to provide upgraded offices and locker rooms for staff.
Location: Moraine
Start Date: January 2018
End Date:

Status: Currently in the construction phase

         

 Waving Willow Water Main Replacement
At a
Glance: Montgomery County Environmental Services is replacing the water mains on Waving Willow Dr. from W. Schantz Ave. to Lytle Ln.
Location: 
Kettering
Start Date:
July 2018
End Date: 2019

Seville and Templehurst Water Main Replacement
At a Glance: Montgomery County Environmental Services is replacing the water mains on Seville Dr. from Sydenham Dr. to Taywood Rd. and on Templehurt Rd. from Seville Dr. to Skylark Dr.
Location:
Clayton
Start Date:
July 2018
End Date:
July 2019
  Nutt Road Water Main Extension
At a Glance: Washington Township is widening the roadway from School House Park to Clyo Rd.  Within the project a portion of Montgomery County Environmental Services (MCES) water line is being lowered.  Additionally, approximately 700 feet of 12” water main is being placed to connect MCES' 12” main on either side of a culvert. 
Location: 
Washington Township (Nutt Rd.)

Status:
COMPLETED

*NOTE: While our portion of this project is complete, Washington Township is still finishing up paving work.

Miami Shores Lift Station Improvements
At a Glance:
Montgomery County Environmental Services is currently in the beginning stages of design and will upsize and replace an existing sanitary sewer along Vance Rd. and Pinnacle Rd.
Location:
Moraine (Vance Rd. & Pinnacle Rd.)
Status:
The project is expected to begin in July 2018 and finish in December 2019.

  Dryden Road Preliminary Engineering
At a Glance:
TBA
Location: 
Moraine
Start Date: S
eptember 2017
End Date:
TBA
Erosion Control (Phase 2)
At a Glance: This is a county-wide project that is currently in the design phase. Depending on funding, it is scheduled to last 5 years. The project will focus on stream crossing repairs where either sanitary sewer, water mains, or both have been installed and then erosion has caused adverse impacts to infrastructure. This project will fix the erosion to ensure the safety of water and sewer lines. 
Location: Various
Status:
Currently in the design phase. It is scheduled to last 5 years.

  Concrete Tank Rehabilitation
At a Glance:
Montgomery County Environmental Services (MCES) is
assessing the concrete structures throughout the Eastern Regional Water Reclamation Facility. The study will identify deterioration, cracking, and/or spalling of concrete throughout the plant, in conjunction with an overall facilities replacement or rehabilitation program. Results from the study will allow MCES to undertake necessary infrastructure repairs and ensure occupational safety.
Location:
Eastern Regional Water Reclamation Facility
Status:
In-progress. The second and final phase of concrete inspections are scheduled to happen in January 2018.

Hilton, Glenbeck, Gaylord and West Water Main Replacement
At a Glance:
Montgomery County Environmental Services will replace water mains on Gaylord Ave. between West Ave. and Dorothy Ln.; West Ave. between Gaylord Ave. and Wiles Drive; Hilton Dr. between Cardington Rd. and Constance Ave.; and Glenbeck Ave. between Hilton Dr. and South Dixie Ave.
Location:  
Kettering
Start Date:  
January 2019
End Date: June 2020

 

Beatrice Lift Station Replacement
At a Glance:
TBA
Location:
Riverside
Start Date: 
July 2018
End Date: July 2019
Status: Currently in design phase.


Wenzler Park Water Main Replacements
At a Glance:  Montgomery County Environmental Services is planning to replace water lines in the Wenzler Park neighborhood plat.
Location:
  Kettering
Start Date: June 2018 
End Date: June 2019